Science Labs at Seaside and Walteria Elementary Schools

Science Labs

Status

Bidding Closed

Prebid Date10/18/18 9:00 am

Bid Date10/31/18 10:00 am

Company & Contacts

Balfour Beatty Construction (OC/LA)

Wolfang Calderon 818-321-4439 / Rosendo Pantoja   (949) 697-2121

Location

Torrance Unified School District

Balfour Beatty Construction LLC
Invitation for Bids

¬
Date: 10/03/18
Your company has been issued an invitation to bid on the project identified below for Balfour Beatty Construction:

Project: Torrance Unified School District Science Labs at Seaside and Walteria Elementary Schools.

Location: Seaside Elementary School – 4651 Sharynne Lane, Torrance CA 90505 Walteria Elementary School – 24456 Madison Street, Torrance CA 90505

Bid Date: 10/31/18 Time: 10:00 AM

Start Date: 11/26/18 Duration: 75 Calendar Days

Pre-Bid Job Walk: 10/18/18 at 9 am Final RFI Accepted: 10/22/18 at 12 pm Starting at Seaside Elementary School.
____________________________________________________________________________________________________________

Description:

CM Multi Prime delivery method. The project consists of soil preparation, concrete, asphalt, landscaping and utility placement for Silver Creek Science Buildings. No exclusions of work In the Bid Packages will be allowed.

Project Notes:

This project is being proposed as “BID PACKAGES”. The proposal packages are as follows:

Bid Pkg No. Title License Class
1 Site Demo, Grading, Concrete and Asphalt C8, C12 or B
2 Electrical C10
3 Plumbing C36
4 Specialties and Miscellaneous B, C33 or C45

Special Instructions:

- Each bidder shall be required to hold their bids for sixty (60) days from date of submission, unless otherwise specified in Torrance Unified School District Front End Documents.

- Any proposals with a contract value in excess of $500,000 must be prequalified with Balfour Beatty Construction. To prequalify, follow the following link: http://prequal.balfourbeattyus.com/login

- Contractors with B license and subcontractors with C-10 and C36 licenses must submit a complete prequalification package to Torrance Unified School District through PQBids website: https://pqbids.com/Torrance-usd/ no later than ten (10) business days prior to the bid opening.

How to obtain construction documents:
Construction documents are available by opening the following link:

Science Labs at Seaside and Walteria Elementary Schools.
https://www.reprohausplanroom.com/jobs/public

Documents can also be obtained at:
reproHaus
9431 Dowdy Dr.
San Diego, CA 92126
phone 6192344287| fax 6192344289
production@reprohaus.net

Contact Estimating department for pricing and availability

Contacts:

Wolfang Calderon, Project Manager, (818) 321-4439, wcalderon@balfourbeattyus.com
Rosendo Pantoja, Project Superintendent, (949) 697-2121, rpantoja@balfourbeattyus.com